In conventional procedures, a silo vehicle is filled with bulk material from a vertical silo by the manufacturer. Often the material is then transported to the packaging company where it is filled into bulk bags or sacks. Once driven by trailer to the port the material is put into sea containers and is finally ready for shipment.
The Siloadmaxx is completely different - the sea container can be filled from a silo vehicle or loader directly on site at the factory – up to 25 tonnes in just 25 minutes. Conventional loading methods for loose materials such as belt or worm conveyors or the intermediate step at the packaging company are no longer required.
The following example explains the individual steps in the process. In a direct comparison the substantial reduction in time is clear.